Sherwood is two towns as far as siding goes. One is the old railroad town laid out by J.C. Smock and his wife, Mary Ellen Sebastion, whose first name, Smockville, survives in the City code; there the Old Town Overlay spells out which siding materials are allowed and which are not. The other is everything built since 1990, when a town of about 3,000 people became a suburb of more than 18,000 in little over two decades. Most requests here come from that second town, but a job in the first is governed by a different set of rules altogether.
If the house is in Sherwood’s Old Town Overlay (ZIP code 97140), say so when you request a siding quote: the overlay lists which siding materials are allowed and which are not.
From Smockville to the 1990s boom
The City’s history of Sherwood begins with the railroad. In 1885 Smock granted it a right-of-way across his land, and in 1889 he and Mary Ellen laid out and named the streets around the tracks; the town that grew up there was called Smockville. In the early 1890s its brickyard supplied building brick for much of Portland’s growth. The brickyard closed in 1895, fire razed most of the business district a year later, and after another fire in 1911 the city council recommended that all new buildings be fireproof. A fruit and vegetable cannery and a tannery carried the town until 1971. Sherwood incorporated in 1893, and in 1911 its city limits were one square mile holding about 350 people.
The modern city came late and fast. The City’s 2020 housing background report records growth from 3,000 residents in 1990 to nearly 18,600 in 2013, averaging 8 percent a year, with the fastest growth in the 1990s. It also notes that Sherwood’s duplex-style homes are mostly in 1990s subdivisions where every home is one half of an attached pair.
Sherwood homes by decade
Current Census Bureau estimates (ACS 2020-2024) date the median Sherwood home to 1997:
| Years built | Share of Sherwood homes |
|---|---|
| Before 1970 | about 5% |
| 1970s | about 12% |
| 1980s | under 5% |
| 1990s | about 38% |
| 2000s | about 29% |
| 2010 and later | about 11% |
Two decades, the 1990s and 2000s, account for about two-thirds of the housing, while the 1980s added almost nothing. Detached single-family houses account for about 72 percent of units, and owner-occupied homes for 72 percent of households, both higher shares than in Tigard, Tualatin or Wilsonville.
What 1990s and 2000s siding needs
The two documented settlement windows for failing lap siding cover part of Sherwood’s boom and miss the rest. The hardboard settlement, best known by the Masonite name, applied to siding installed between 1980 and January 1998. LP’s Inner-Seal OSB siding had its own class action in Oregon’s federal court, for siding installed before 1996. Claims under both ended long ago. A Sherwood house built from 1990 to the middle of the decade sits inside both windows, one from the late 1990s inside the hardboard window only, and the 2000s houses outside both. None of that says what is on a particular wall; a cut edge at a corner or vent does.
The failures to look for follow from that:
- Swelling at the lower edges of lap boards, soft nail holes and paint that will not hold are the signature of hardboard and OSB siding failure.
- Stains or softness under windows and at roof-to-wall corners point to flashing, whatever the siding; see water behind siding.
- The shared wall in a duplex pair is where one owner’s re-side ends and the neighbor’s begins, and where both owners’ decisions meet. Agree on the material, color and the edge detail with the neighbor before either house is quoted.
For a few failed boards, siding repair with new boards of fiber cement or engineered wood sized to the old exposure is the usual fix, since most 1990s hardboard profiles are no longer made. Once swelling shows on all sides of the house, siding replacement is the durable answer, with new water-resistive barrier and flashing, and fiber cement is a common choice. Vinyl is prohibited in Old Town, and the City’s newer-house standards bar it too, as below, so settle the material question with the City before comparing vinyl quotes.
Old Town: siding rules in writing
Chapter 16.162 of the Sherwood Zoning and Community Development Code applies the Old Town Overlay to the Smockville subdivision and the residential and commercial properties around it. The overlay is itself designated a historic district, and it has two parts: Smockville and the Old Cannery Area. The Smockville design standards apply through the land use approval process when exterior remodeling or new development is proposed there; they do not apply in the Old Cannery Area. The Landmarks Advisory Board, which includes the Planning Commission, decides applications under them.
For siding, the standards say:
- Keep the original. Where alterations to an existing exterior are proposed, original siding should be maintained, repaired first and, where that is not possible, patched with in-kind matching material. Combed cedar siding added during a later historic period is historically appropriate and may stay.
- What is allowed: horizontal wood siding with a maximum of 8 inches exposed to the weather, where concrete or manufactured wood-based boards are acceptable; wood shingles, preferably painted, up to 12 inches to the weather; true board-and-batten vertical wood siding, painted; brick; and brick or stone veneer under conditions. Smooth faces are strongly encouraged over rustic or exposed-grain boards.
- What is prohibited: T-111 or similar 4-by-8 sheet materials or plywood, horizontal metal or vinyl siding, stucco other than as foundation cladding or a secondary detail, foam-based stucco systems, plastic or fiberglass, and faux stone.
- Trim: door and window casings must stand at least half an inch proud of the wall surface; trim set flush with the siding is not permitted in Old Town.
- Windows: original windows are to be kept and, if needed, restored to working order, which matters when a re-side tempts a window swap too.
The overlay’s community design section also asks for earth-tone exterior colors, reviewed with the land use application. Ask the City’s planning staff whether a color change alone needs review. On a qualifying Old Town house, cedar siding and historic wood siding repair are the routes that sit most comfortably inside these rules.
Designated landmarks outside the overlay
Sherwood’s landmark chapters reach beyond Old Town. Under Chapter 16.168, alterations subject to landmark review include any overlay of an existing facade with new siding material, while repair or replacement of siding done in kind to closely match the existing material and form is normal maintenance and exempt. Where replacement is necessary, the new material should match the old in composition, design, color and texture. Under Chapter 16.164, an exterior-only renovation of a designated landmark is processed as a Type 2 administrative review, which requires a third-party review by a qualified historic preservation professional.
How many buildings are designated is less clear. The City’s 2019 heritage background report says the 1989 Cultural Resource Inventory identified 132 potential historic landmarks, and that the inventory has not been updated since. Ask the Planning Department whether a particular house is designated rather than assuming either way.
Material rules for newer houses
Outside Old Town, Chapter 16.14’s residential design standards prohibit aluminum, vinyl and T-111 siding. They apply to new residential construction and to expansions or conversions that add more than 50 percent of area to an elevation facing a street or public accessway. The code does not say whether a straight re-side of an existing house triggers them, so ask the Planning Department before choosing vinyl or panel siding; a re-side that comes with a large street-facing addition clearly does.
Permits for a Sherwood re-side
Sherwood’s permitting page does not list exempt work; it asks anyone unsure whether a project needs a permit to call the Building Department. The rule that governs is the statewide one. Section R105.2 of the Oregon Residential Specialty Code lists siding among exempt work unless the wall has to carry a fire-resistance rating, and the state’s homeowner permit page says the same.
The exemption has edges:
- Close to the lot line. Under 3 feet from the property line, an exterior wall needs a fire-resistance rating, and re-siding a rated wall takes a permit. Measure the side yards before assuming.
- Behind the boards. Repairs that cut away part of a wall or a load-bearing member are not exempt; if the tear-off exposes rotten sheathing or framing, call the Building Department before it is rebuilt.
- Openings. Windows replaced with no structural change are exempt; enlarging or cutting an opening is not.
- Wiring. The Building Department notes that electrical work in the city is permitted and inspected by Washington County, so moving an exterior fixture during the job means a county electrical permit.
Sherwood addresses outside the city
ZIP code 97140 is far larger than the city. Measured by land, the city holds only about 11 percent of it in the Census Bureau’s 2020 ZIP code tables, and roughly 88 percent is outside every city and census-designated place. By land, about 75 percent of it is in Washington County, 23 percent in Clackamas County and 2 percent in Yamhill County. Each county issues permits on its unincorporated land: Washington County Building Services, Clackamas County, and Yamhill County’s building division. None of Sherwood’s Old Town or landmark rules apply out there, and the county building office, not the City’s, is the one to call.
Wetter ground to the southwest
The nearest long-record NOAA station is Rex 1 S, about 5 miles southwest of Sherwood. Its 1991-2020 normals total about 44 inches a year, some 7 inches more than Portland International’s. December averages over 7 inches there and November and January about 6.5 apiece, while July and August together get less than an inch. A station is not a city, but the numbers are a fair reminder that walls opened in winter here get wet. The dry window for a re-side, as across the metro, is midsummer.
Before asking for a Sherwood quote
- Old Town or not? If the house is in the Smockville part of the overlay, the material list above governs, and land use approval comes before the contractor’s schedule.
- Designated landmark? Ask the Planning Department.
- Inside the city? A 97140 address outside the limits is county work.
- Lead: about 17 percent of Sherwood homes predate 1980. A pre-1978 house brings Oregon’s lead rules: once work disturbs 20 or more square feet of painted exterior, the contractor must be licensed by the CCB for lead-based paint renovation.
- Trees: for a mature tree, meaning a deciduous tree over 10 inches in trunk diameter or a conifer over 20 inches, removal of up to five trees in 12 months needs no approval outside wetlands, floodplains and earlier protected areas, but the Planning Department must have written notice 48 hours ahead (Chapter 16.140).
- Duplex pair? Talk to the neighbor first.
Sherwood price references
There is no published Sherwood figure. For fiber cement, the most likely replacement for failing hardboard, Angi’s Portland-market guide gives $9 to $16 a square foot installed, checked September 27, 2026; for engineered wood lap, the other common successor, HomeGuide’s national range is $7 to $12 per square foot. In Old Town, where wood shingles and real wood lap are on the permitted list, HomeGuide’s national cedar range is $6 to $16 for each square foot put up. A repair visit in the Portland market runs $903 to $2,835 by Angi’s figures. Where each number comes from is on the siding cost page, and the guide to Oregon siding quotes explains what else a bid should show.
Nearby: Tualatin, Tigard and Wilsonville.
Last updated