Asbestos siding in Oregon is a question to settle before anyone prices a re-side, not after the first shingle cracks. Asbestos-cement siding went onto American houses for much of the twentieth century, Portland has thousands of houses from those decades, and Oregon’s rules on surveying, removing and disposing of it apply whether the siding turns out to be asbestos or not. This guide covers how to recognise it, how it gets tested, what Oregon requires before it comes off, and how it shows up in a quote. Sources are linked where each rule is stated; the rules were read at source on October 4, 2026.
What asbestos-cement siding looks like
Asbestos-cement siding is a hard, thin, brittle-looking board made from cement reinforced with asbestos fibers. The National Bureau of Standards (now NIST) tested 23 samples from eight US makers in 1951 and recorded what most of them had in common:
- Shingle size. Most were about 24 inches long and 12 inches high, laid in courses like oversized wood shingles. Clapboard-style lengths were made as well.
- Thickness. Roughly an eighth to a fifth of an inch.
- Nail holes. Five or six per piece, made at the factory, usually visible along the bottom edge.
- Surface. Twenty of the 23 had a wood-grain texture pressed into the face; 19 were white or gray, though many have since been painted.
The same report dates the first shingles made specifically for siding to 1932, and the National Park Service notes that asbestos-cement shingles and siding were produced into the 1980s. So the era of the house is a clue, not a test. Neither is the look: the EPA says that, generally, you can’t tell whether a material contains asbestos simply by looking at it unless it is labeled. Fiber cement siding sold today, such as James Hardie’s, is a different, asbestos-free product with a similar name; see fiber cement siding.
Why it matters before a re-side
The EPA’s guidance is that material in good condition that will not be disturbed should be left alone, and that you do not need to have it tested if it is not damaged and will not be disturbed. A re-side disturbs it by definition. That is where Oregon’s rules start.
Oregon DEQ requires the owner or operator to have an accredited inspector complete an asbestos survey before any renovation or demolition (OAR 340-248-0270). Houses and other residential buildings of four or fewer units built after January 1, 2004 are exempt (OAR 340-248-0250), which is why DEQ’s housing page describes the rule as applying to homes built before 2004. The survey covers more than siding: anything the job will disturb, from old building paper to window caulk, falls under it, and that includes stucco coming off a wall; see replacing stucco with siding.
The exception people hear about is narrower than it sounds. DEQ’s homeowner fact sheet (updated August 16, 2021) exempts owner-occupants doing their own renovation work inside their home. Siding is on the outside, so a re-side, whether a contractor or the owner does it, needs the survey. A copy of the survey report stays on site while the work goes on.
How the siding gets tested
An accredited inspector takes samples and sends them to a laboratory. Since January 1, 2021, Oregon requires survey samples to be analyzed by a lab in a nationally recognized accreditation or proficiency-testing program, and DEQ keeps a list of laboratories. Two alternatives are allowed: the survey may presume a material contains asbestos rather than sample it, and a job may skip the survey if every material is handled and disposed of as friable asbestos. Either way, presumed material is handled exactly as asbestos would be.
The EPA does not recommend taking samples yourself. DEQ allows an owner who lives in the home being remodeled to take a sample, but strongly recommends using an accredited inspector, and the survey rule for exterior renovation asks for an accredited inspector.
No new siding over the old
Covering old siding with new is a common way to avoid a tear-off. In Oregon it is not an option over asbestos-cement siding. DEQ’s fact sheet for contractors says installing new siding over cement asbestos siding is prohibited, because the installation process makes the cement siding friable. The same sheet bars sanding, grinding and power tools on it. The siding comes off first.
Who may remove it, and how
Intact cement siding counts as nonfriable: it cannot be crumbled by hand when dry. DEQ lists three groups who may remove nonfriable asbestos: DEQ-licensed asbestos abatement contractors, home and property owners, and contractors licensed by the Construction Contractors Board. DEQ strongly recommends that homeowners hire a licensed abatement contractor rather than do it themselves.
Once the material is weathered, broken or crumbling, DEQ treats it as friable, and friable abatement is work for DEQ-licensed contractors only. That is the reason removal is done carefully. DEQ’s guide for contractors removing nonfriable cement asbestos and the rule itself set out the method:
- Notify DEQ first. A contractor files a nonfriable notification with its fee at least five days before work starts. An owner removing siding from the single-family home they live in, which is not a rental or about to be demolished, is exempt from notification.
- Keep it wet. The material is kept adequately wet while it comes off.
- Take it off whole. Pieces are removed intact, not broken, dropped or thrown, and never cut, sanded or ground.
- Package and label it. Waste is kept wet and sealed in leak-tight containers, such as two 6-mil plastic bags, labeled with the required warning and where the waste came from.
- Dispose of it properly. It goes to a disposal site permitted to accept asbestos, with a DEQ waste shipment record that is kept for three years (OAR 340-248-0280). DEQ notes that landfills may take asbestos by appointment only.
A repair that disturbs less than three square feet or three linear feet can fall under DEQ’s small-project exemption, as long as removing asbestos is not the point of the job and the work follows Oregon OSHA’s rules. A larger job cannot be split into small ones to qualify.
Lead paint on the same walls
A house old enough for asbestos siding is usually old enough for lead paint, and the two rules run side by side. In Oregon, anyone paid to renovate a home built before 1978 needs the CCB’s lead-based paint renovation license as well as the ordinary CCB license (CCB specialty licenses). Disturbing 20 square feet or less of painted exterior surface counts as minor repair; a tear-off is far past that. Lead-safe work outside means covering the ground and closing windows and doors near the work area (Oregon Health Authority). Ask every bidder for both license numbers; the guide to comparing siding quotes in Oregon shows how to look them up.
A note on demolition in Portland
Re-siding is renovation, not demolition, and the City of Portland’s demolition rule says removing siding does not count as removing a wall. If a job does grow into demolishing all or part of a house, Portland Permitting & Development will not issue the demolition permit without the asbestos survey paperwork (PPD 25.01). The rule does not cover unincorporated Multnomah County.
How it shows up in a quote
Asbestos work is priced apart from the siding, and none of it appears in the published ranges on the siding cost page. On a house built before 2004, a complete siding replacement quote should name:
- the asbestos survey and lab analysis, and who arranges it;
- what happens if the siding tests positive: who removes it, and whether that is the siding contractor or a separate abatement contractor;
- the DEQ notification and fee, and who files it;
- wetting, packaging, hauling and the disposal site;
- on a pre-1978 house, lead-safe setup and cleanup;
- what the price assumes if the survey comes back negative.
Getting those lines in every quote is what makes two bids for the same house comparable. Once the old siding is off, the rest of the job is the same as any re-side: sheathing repair, house wrap, flashing and the new cladding.
This page is general information, not professional advice about your specific situation. Have it assessed by a qualified professional before making decisions.